Saturday, September 15, 2012

More rotten wood

The shower floor was soft, and I did not want to be taking a shower and suddenly end up under the camper, in my birthday suit.
Rot under shower floor
Rot at entry door, notice the 2 layers of plywood that had been overlayed on the entire floor area.

Removed the back 3 feet of camper floor that hangs out past the truck bed

Building up the new section, 2 layer of 1/2 inch plywood, with braceing and voids were fitted with 3/4 inch dow corning foam board
New section installed, and coated with rubberized automotive undercaoting

No comments:

Post a Comment